Technical Specifications and Installation Guide for Wet Alarm Check Valves
time:
2026-11-18
Technical guide for the Ningjin APC UL/FM-certified wet system alarm check valve (Model SSBJ-300GG/FF/FGA/FGB), detailing installation and maintenance.
System Integration & Operation
A wet system alarm check valve serves as the central hydraulic and alarm interface in commercial and industrial fire protection grids. Designed by Ningjin APC Industries (Model SSBJ-300GG/FF/FGA/FGB), the valve operates seamlessly under both constant and variable supply pressure conditions. When automatic sprinklers activate, the valve disc lifts off its seat, permitting an uninterrupted water stream into the distribution piping while diverting flow through the trim to actuate mechanical and electrical alarms.
Installation Guidelines
Proper installation ensures reliable system response:
- Location: Install the valve vertically in an easily observable and accessible indoor location with the water flow arrow pointing upwards, reserving adequate space for repair and maintenance.
- Pipeline Preparation: Clean the system pipe network completely before installation. Ensure inner walls have rust-proof layers and are free of dreg or dirt.
- Leakage Testing: Check joint seals and valve disc mobility. Carry out a leakage test at two times the rated working pressure; the valve disc must be entirely leak-free.
- Trim & Accessories: Mount the pressure switch and water motor alarm vertically on top of the delayer. Bind the retard chamber with a clamp to the piping to prevent movement.
Care and Maintenance Protocol
To maintain peak operational integrity:
- Clean dirt and foreign matters from the rubber seal surface of the valve disc. Rubber seals have a service life of no more than eighteen months; replace timely if worn or aging.
- Keep small throttle holes in the delayer and valve disc seal groove unobstructed without scratching sealing surfaces.
- Inspect and clean the Y-strainer filter regularly.
- Test the water motor alarm and pressure switch every three months.
Frequently Asked Questions (FAQ)
The pipe network must be completely cleaned to ensure inner walls have a rust-proof coating and are free of dirt and debris.
A leakage test must be carried out at two times the rated working pressure.
The service life of the rubber seals is generally no more than eighteen months, requiring timely replacement if worn or aging.
The water motor alarm should be checked every three months, including testing alarm sound volume and clearing sediment.
Flange standards include ASME/ANSI B16.1 Class 125, ASME/ANSI B16.42 Class 150, BS EN 1092-2 PN16, and GB/T9113.1.
No, in addition to trim support, the retard chamber must be secured with a clamp attached to the piping to prevent looseness.
Relevant news
APC Industries
Mobile website
Add WeChat chat
CONTACT US
Add:No. 18 Taishan Road, Ningjin County, Shandong Province P.R.China
Mobile:+8618600252968
WeChat:cuiyuying01
E-Mail: